| Case Study - Giza, Egypt September 2007 Following the site visit, a solution was proposed to maintain the installation in a standalone environment that was not reliant on the city power supply. This meant Laser-Scan sourcing the following equipment for the installation:
|
| << Previous Page | Next Page >> |